
This image shows the yard throat of the storage sidings with the coal branch flyover in place. I did a test on the DCC electronics I have installed in this section of track and (as I expected) I hadn’t set things up right so it was another order of DCC parts from my usual supplier and a wait of a week or so while the package arrives.