Not Watching Paint Dry

I’ve been on a break from work for the past two weeks. At a social gathering with my staff on the final Friday work afternoon we were talking about what we were going to be doing over the break to which I replied “painting my train room”. They all laugh at my eccentric hobby but they were also well aware that I was dead serious. I planned on painting my newly lined train room. I had thoughts that I’d knock the job over by Friday of the first week and then I could spend some time doing some other jobs around the house and possibly even make a small start on building the layout.

HA! That plan crumbled to ashes when I came to realise just how many hectares of wall board it took to line the room, of which each and every square cm needed to be painted. So it will come as no surprise if I reveal that while the painting of the room is now complete I made the last brush stroke at 6.30pm this evening (that’s the Sunday evening before I go back to work).

This just a quick shot of the completed paint job taken on my phone. I didn’t have the strength to walk into the house and get my camera! 🙂

The electrician came on Thursday and installed the lights and power outlets and some vinyl flooring is going down next Wednesday.

So as the job of painting the room was complete and will be layout ready within the next two weeks after final fit out, I decided that it was time to get the plan out and take a hard look at what I wanted to actually build.

This is getting close to the final plan. I have some tests to carry out on the curve radii to ensure that the locos I want to operate will navigate the curves but this plan incorporates almost all the changes I feel that I needed to make.

This version of the plan (V3.7) incorporates most of the changes I’ve been thinking about during the seemingly endless hours of painting. I’ve widened the aisle between the Shell depot and the Oak Dairy benchwork, I’ve moved the 75′ TT away from the door to provide a bit more clearance on entry and better reflect the arrangement at the real Muswellbrook but most importantly I’ve lengthened the yard at Muswellbrook. The main line loop has gone from just over 2.6m to just under 4m. This had been on the cards for a while but a friend paid me a visit on Friday and when he told me that a 2.5m long loop would only allow for a train that had 10 S wagons (with loco and van) I decided to bite the bullet and make the change. In drawing these changes I was forced to rethink the arrangement of the turntable and the approach line to this. I’ve lost the double approach to the table but shifting this further back toward the yard in this switch back arrangement mimics the arrangement of the engine facility at Muswellbrook. I’ve also penciled in a Garratt turntable arrangement here which mimics the Garratt triangle located on this line. This won’t have scenery but it will serve the dual purposes of acting as a shunting neck for locos accessing the table and will also allow for the turning of a Garratt. This is all a bit speculative but it would be nice to be able to represent the way an empty train would have arrived at Muswellbrook yard headed by an AD60 and while coal was being loaded the Garratt would have been turned and coaled on the triangle ready to haul the loaded train back down the Hunter Valley.

You might also note in the info box at the bottom left hand corner that the grade is now included (at 2%, providing me with 50mm more clearance over the storage roads from the last plan) and that the min radius has gone down to 1727mm. This is to accommodate the inner radius of curved Peco points. There’s not much point in saying the minimum radius of the layout curves are 1.8m when the radius on 5 of the points is 1.727m. So my use of Peco points is having a knock on effect to the rest of the plan. Hence the need for some tests I plan to carry out in the next couple of weeks to make sure the locos I want to run on this layout will negotiate these tighter than expected curves.